STLAA West LIB Lowering and CUP Enabling Works Project

INVITATION TO BID Alberici|Tarlton|KAI (ATK) is requesting subcontractor proposals for the STLAA CTP – Garage and Landside Roadways Project – lowering Lambert International Blvd. (LIB) adjacent to the Dept. of Defense property and enabling works for the Central Utility Plant (CUP) site. The project consists of site demolition and excavation, soldier pile walls, sewer installations, building demolition, traffic control, site electrical, building pad preparation for CUP, relocation of AOA fencing limits, and final paving/sidewalks/curbing/striping. A virtual pre-bid & outreach event is scheduled for 9/8/2026, at 10:30 a.m. To participate in the pre-bid, contact Peter Nuernberger, at pnuernberger@alberici.com, or 314-733-2422. Sub bids are due, 9/29/2026, by 10:00 a.m., and should be submitted through BuildingConnected.com, by visiting www.alberici.com/trade-partner-opportunities/, and selecting “View Bid Opportunities.” It is our desire to provide meaningful opportunities for small business enterprises (SBE). The City of St. Louis Lambert International Airport Office of Business Opportunity (OBO) has established a 28% SBE goal for the project.